(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
[Connection Type]Flange; Connection shape: Flange; Material: Cast iron; Fluid used: Water/Air/Steam/Gas/Oil
Japanese Only
| Part Number |
|---|
| F-B-1 |
| F-B-1/2 |
| F-B-2 |
| F-B-3 |
| F-B-3/4 |
| F-B-4 |
| F-B-5 |
| F-B-6 |
| F-B-11/2 |
| F-B-11/4 |
| F-B-21/2 |
| F-W-1 |
| F-W-1/2 |
| F-W-2 |
| F-W-3 |
| F-W-3/4 |
| F-W-4 |
| F-W-5 |
| F-W-6 |
| F-W-11/2 |
| F-W-11/4 |
| F-W-21/2 |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal of Thread M1 | Surface Treatment |
|---|---|---|---|---|---|---|
MYR 189.38 | 1 Piece(s) | 15 Day(s) or more | 1B(25A) | No | ||
MYR 166.45 | 1 Piece(s) | 15 Day(s) or more | 1/2B(15A) | No | ||
MYR 351.00 | 1 Piece(s) | 15 Day(s) or more | 2B(50A) | No | ||
MYR 712.30 | 1 Piece(s) | 89 Day(s) or more | 3B(80A) | No | ||
MYR 178.08 | 1 Piece(s) | 15 Day(s) or more | 3/4B(20A) | No | ||
MYR 1,038.88 | 1 Piece(s) | 15 Day(s) or more | 4B(100A) | No | ||
MYR 1,950.73 | 1 Piece(s) | 15 Day(s) or more | 5B(125A) | No | ||
MYR 2,284.31 | 1 Piece(s) | 15 Day(s) or more | 6B(150A) | No | ||
MYR 299.90 | 1 Piece(s) | 15 Day(s) or more | 1 1/2B(40A) | No | ||
MYR 278.90 | 1 Piece(s) | 15 Day(s) or more | 1 1/4B(32A) | No | ||
MYR 640.16 | 1 Piece(s) | 15 Day(s) or more | 2 1/2B(65A) | No | ||
MYR 189.38 | 1 Piece(s) | 15 Day(s) or more | 1B(25A) | Zinc Plating | ||
MYR 166.45 | 1 Piece(s) | 15 Day(s) or more | 1/2B(15A) | Zinc Plating | ||
MYR 351.00 | 1 Piece(s) | 13 Day(s) or more | 2B(50A) | Zinc Plating | ||
MYR 712.30 | 1 Piece(s) | 15 Day(s) or more | 3B(80A) | Zinc Plating | ||
MYR 178.08 | 1 Piece(s) | 15 Day(s) or more | 3/4B(20A) | Zinc Plating | ||
MYR 1,038.88 | 1 Piece(s) | 15 Day(s) or more | 4B(100A) | Zinc Plating | ||
MYR 1,950.73 | 1 Piece(s) | 15 Day(s) or more | 5B(125A) | Zinc Plating | ||
MYR 2,284.31 | 1 Piece(s) | 15 Day(s) or more | 6B(150A) | Zinc Plating | ||
MYR 299.90 | 1 Piece(s) | 15 Day(s) or more | 1 1/2B(40A) | Zinc Plating | ||
MYR 278.90 | 1 Piece(s) | 15 Day(s) or more | 1 1/4B(32A) | Zinc Plating | ||
MYR 640.16 | 1 Piece(s) | 15 Day(s) or more | 2 1/2B(65A) | Zinc Plating |
Loading...
| Connecting Shape | Flange | Connection Type | Flange | Material | Cast Iron |
|---|---|---|---|---|---|
| Connection Thread Type M1 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil | Type | Fitting |
| Max. Operating Pressure(MPa) | 1 | Divisions of Max. Operating Pressure | 1.0Mpa or Less | Interior Resin Lining | No |
| Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) | 1.0 | Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) | 2.5 |

JFEPIPEFITTING
Standard Price : MYR 203.45-
Days to Ship : 9 Day(s) or more

ITOUTETTUKOU
Standard Price : MYR 49.74-
Days to Ship : 7 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy