(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Our website upgrade are completed! Latest improvements are now LIVE to enhance your ordering experience. You may be logged out due to the update. Please take note to login again or reset credentials if needed. More details here. 

Screw-In Malleable Cast Iron Pipe Fitting, Cross with Collar

Screw-In Malleable Cast Iron Pipe Fitting, Cross with Collar

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
BCR-B-1
BCR-B-2
BCR-B-3
BCR-B-3/8
BCR-B-4
BCR-B-5
BCR-B-11/2
BCR-B-11/4
BCR-B-21/2
BCR-W-1
BCR-W-1/2
BCR-W-1/4
BCR-W-2
BCR-W-3
BCR-W-3/4
BCR-W-3/8
BCR-W-4
BCR-W-5
BCR-W-11/2
BCR-W-11/4
BCR-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

MYR 187.68

1 Piece(s) 19 Day(s) or more 1B(25A)No

MYR 259.83

1 Piece(s) 19 Day(s) or more 2B(50A)No

MYR 793.91

1 Piece(s) 89 Day(s) or more 3B(80A)No

MYR 187.68

1 Piece(s) 19 Day(s) or more 3/8B(10A)No

MYR 1,191.80

1 Piece(s) 89 Day(s) or more 4B(100A)No

MYR 2,724.73

1 Piece(s) 89 Day(s) or more 5B(125A)No

MYR 228.85

1 Piece(s) 19 Day(s) or more 1 1/2B(40A)No

MYR 187.68

1 Piece(s) 19 Day(s) or more 1 1/4B(32A)No

MYR 576.23

1 Piece(s) 89 Day(s) or more 2 1/2B(65A)No

MYR 113.78

1 Piece(s) 19 Day(s) or more 1B(25A)Zinc Plating

MYR 69.55

1 Piece(s) 19 Day(s) or more 1/2B(15A)Zinc Plating

MYR 187.68

1 Piece(s) 19 Day(s) or more 1/4B(8A)Zinc Plating

MYR 259.83

1 Piece(s) 19 Day(s) or more 2B(50A)Zinc Plating

MYR 793.91

1 Piece(s) 9 Day(s) or more 3B(80A)Zinc Plating

MYR 71.70

1 Piece(s) 19 Day(s) or more 3/4B(20A)Zinc Plating

MYR 187.68

1 Piece(s) 19 Day(s) or more 3/8B(10A)Zinc Plating

MYR 1,191.80

1 Piece(s) 9 Day(s) or more 4B(100A)Zinc Plating

MYR 2,724.73

1 Piece(s) 89 Day(s) or more 5B(125A)Zinc Plating

MYR 228.85

1 Piece(s) 19 Day(s) or more 1 1/2B(40A)Zinc Plating

MYR 177.50

1 Piece(s) 19 Day(s) or more 1 1/4B(32A)Zinc Plating

MYR 576.23

1 Piece(s) 9 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Cross Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Additional Products in this Category

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)