(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Our website upgrade are completed! Latest improvements are now LIVE to enhance your ordering experience. You may be logged out due to the update. Please take note to login again or reset credentials if needed. More details here. 

Steel Pipe Fitting, Screw-In Pipe Fitting, Street Elbow (SL-3B-B)

Steel Pipe Fitting, Screw-In Pipe Fitting, Street Elbow SL-3B-B

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

SL-3B-B

Part Number
SL-3B-B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Applicable Fluid Surface Treatment

MYR 195.70

1 Piece(s) 11 Day(s) or more 3B(80A)3B(80A)Water / Air / Steam / OilNo

Loading...

  1. 1

Basic Information

Connecting Shape Street Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Black heart malleable cast iron (FCMB27-05)
Connection Thread Type M1 Rc Connection Thread Type M2 R Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No
Band Presence

Please check the type/dimensions/specifications of the part SL-3B-B in the Steel Pipe Fitting, Screw-In Pipe Fitting, Street Elbow series.

Products like this...

Part Number
SL-1/4B-B
SL-1/4B-W
SL-1/8B-B
SL-3B-W
SL-4B-B
SL-4B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Applicable Fluid Surface Treatment

MYR 13.64

1 Piece(s) 7 Day(s) or more 1/4B(8A)1/4B(8A)Oil / Air / Water / SteamNo

MYR 14.38

1 Piece(s) 5 Day(s) or more 1/4B(8A)1/4B(8A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc plating

MYR 13.64

1 Piece(s) 7 Day(s) or more 1/8B(6A)1/8B(6A)Oil / Air / Water / SteamNo

MYR 224.14

1 Piece(s) 7 Day(s) or more 3B(80A)3B(80A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc plating

MYR 367.70

1 Piece(s) 11 Day(s) or more 4B(100A)4B(100A)Oil / Air / Water / SteamNo

MYR 319.66

1 Piece(s) 7 Day(s) or more 4B(100A)4B(100A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc plating

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)